Engineering

   

FPBH, Inc. brings professional experience and expertise to the field of engineering. FPBH is diverse enough to handle most every civil engineering need, from bridge and roadway design to waterline plans, site development to wastewater design. Our Services include, but are not limited to:
Transportation:
Roadway Design & Rehabilitation, Bridge and Culvert Design & Rehabilitation, Traffic Studies, Hydraulic Analysis & Reports.
Building & Site Design:
Schools, Industrial, Commercial, Subdivisions, Building Design & Rehabilitation.
Environmental & Utilities:
Commercial Water/Wastewater Design, Plant Upgrades to Collection/Distribution Lines, Studies/Modeling, Pressure Piping & Gravity Lines, Phase I Environmental.

Printable\Viewable Cut Sheets

Project Location Download PDF
ETC Wet Lab Addition North Vernon, IN
Christian Academy of Madison Madison, IN
4-Plex Sports Building North Vernon, IN
Strategic Sourcing Building North Vernon, IN  
Education & Training Center North Vernon, IN
Senior Housing Buildings North Vernon, IN
Bridge #4 Design Jefferson County, IN
Bridge #51 Design Jennings County, IN
Interstate 64, 3R Design Dubois, Spencer, & Perry County, IN
VFW Post 2021 Activity Hall North Vernon, IN  
Bridge #124 Design Jefferson County, IN
Walgreens Site Design North Vernon, IN
Morgan's Building & Site Design North Vernon, IN
City Service Center North Vernon, IN
Hilex Railroad Spur North Vernon, IN
Lanier Visitor's Center Madison, IN
Lowe's Distribution Center Jennings County, IN
     

 

  ETC Wet Lab Additon 

North Vernon, IN

LOCAL PUBLIC AGENCY
City of North Vernon
John G. Hall - Mayor
275 Main St.


PROJECT COMPLETION DATE
December 2007


Outside of Wet Lab Addition


Inside Showing Stations

Inside Wet Lab

PROJECT DESCRIPTION

This project included the design of a science wet lab addition to the existing Education and Training center. This also included the renovation and addition of a men's and women's restroom.

 

  CHRISTIAN ACADEMY OF MADISON 

Madison, IN

OWNER/BUILDER
David Gosman
477 W. Hutchinson Ln.

PROJECT COMPLETION DATES
2007

Front Entrance of School

PROJECT DESCRIPTION

FPBH provided the building design utilizing efficiencies of pole barn construction practices. An existing garage was renovated and expanded to house the school.
All design of electrical, plumbing, HVAC, site, and architecture by FPBH to obtain an Indiana Construction Design Release.


School Sign




Classrooms

 

  4-PLEX SPORTS BUILDING 

North Vernon, IN

LOCAL PUBLIC AGENCY
City of North Vernon Common Council

275 Main Street
North Vernon, IN 47265

Chad Speer – Park Director

PROJECT COMPLETION DATE
2007


Color Rendering of Building


Floorplan and Roof Design

Finished Building


Aerial View of Entire Site

 

PROJECT DESCRIPTION

FPBH, Inc. provided the complete building and site design for this project. The building contains men's and women's restrooms, concession, scorer's booth for all 4 fields, and storage. This project was partially funded by Lowe's, so color selection was based off of their logo.

 

  STRATEGIC SOURCING BUILDING 

North Vernon, IN

OWNER
Strategic Sourcing

PROJECT COMPLETION DATE
2007


Preliminary Rendering


Finished Building

PROJECT DESCRIPTION

FPBH, Inc. provided the complete building and site design for this project. The building contains office area, ADA restrooms, conference room, break room, reception, and a large open floor second story for storage.

 

  EDUCATION & TRAINING CENTER 

North Vernon, IN

PUBLIC AGENCY - OWNER
City of North Vernon
John G. Hall - Mayor
275 Main St.

PROJECT COMPLETION DATE
2006

ETC Front Entrance

PROJECT DESCRIPTION

This project included a renovation and transformation of an abandoned nursing home to be able to accommodate an education and training center. This building also has the capacity to contain other uses in the future when it is needed.

FPBH Inc., designed and coordinated this project including site work and interior work. The site work included a new parking lot, old pavement removal and resurfacing, drainage plans, landscaping, and lighting. The interior work included demolition of existing walls, construction of new partitions, finishing work, public ADA restroom design, and lighting.


 

  SENIOR HOUSING BUILDINGS 

North Vernon, IN

OWNER
North Vernon Senior Housing Authority

Mayor John Hall
275 Main Street
North Vernon, IN  47265

PROJECT COMPLETION DATE
2006


Finished Housing Units


Inside ADA Unit Kitchen

PROJECT DESCRIPTION

This project included the design of four units with four apartments and one utility room in each. One apartment in each building was designed to be ADA compliant.

 

  BRIDGE #4 DESIGN & INSPECTION 

Jefferson County, IN

PUBLIC AGENCY - OWNER
Jefferson County Board of Commissioners
Mike Frazier, President
Julie Berry, Commissioner
Gregg Sinders, Commissioner
Courthouse, 300 E. Main Street
Madison, IN 47250

PROJECT COMPLETION DATES
2006

Bridge Elevation View


Bridge Angle View

PROJECT DESCRIPTION

FPBH, Inc. provided the survey, right-of-way, preliminary, and final design engineering, specifications, bid documents, construction stakeout, construction inspection and material testing services for this locally funded bridge project for the Jefferson County Commissioners.

 

  BRIDGE #51 DESIGN & INSPECTION 

Jennings County, IN

LOCAL PUBLIC AGENCY
Jennings County Board of Commissioners
Robert R. Willhite, President
Richard B. Schneider, Commissioner
James Reeves, Commissioner
Government Center, 200 Brown Street
Vernon, IN 47282

PROJECT
Jennings County Bridge #51
B-27088

PROJECT COMPLETION DATE
December, 2006

Side View of Bridge #51


Jennings County Bridge #51

PROJECT DESCRIPTION

FPBH, Inc. provided the construction engineering, inspection, and material testing services for this Federal Aid/ locally funded bridge project for the Jennings County Commissioners.

The old bridge was a three span concrete T-beam in poor condition. The new bridge is a continuous three span precast/prestressed composite concrete I-beam bridge with a cast-in-place reinforced concrete deck. The center piers are set on a spread footer keyed into solid bedrock. The end bents are reinforced concrete integral caps on steel H-piles with spill through slopes protected by revetment riprap. Thrie-beam steel bridge railing was used on the bridge.

FPBH, Inc. has designed and inspected numerous other local bridge projects for the Jennings County Board of Commissioners.

 

  INTERSTATE 64, 3R DESIGN 

Dubois, Spencer & Perry County, Indiana

STATE AGENCY
Indiana Department of Transportation
Vincennes District

PROJECT COMPLETION DATES
Section I- Built in 2000
Section II- Built in 2003

Ramp Work Next to Slide Repair Area


GPS Survey

PROJECT DESCRIPTION

FPBH, Inc. provided the survey and design for two sections of 3R Rehabilitation on Interstate 64, consisting of approximately eight miles each.

 

  VFW POST 2021 ACTIVITY HALL 

North Vernon, IN

OWNER
VFW Post 2021

PROJECT COMPLETION DATE
2005


VFW Building


Inside VFW Building

PROJECT DESCRIPTION

FPBH, Inc. provided the building and site design for this project.

 

  BRIDGE #124 DESIGN & INSPECTION 

Jefferson County, IN

PUBLIC AGENCY - OWNER
Jefferson County Board of Commissioners
Mike Frazier, President
Julie Berry, Commissioner
Gregg Sinders, Commissioner
Courthouse, 300 E. Main Street
Madison, IN 47250

PROJECT
Jefferson County Bridge #124

PROJECT COMPLETION DATE
2006

Bridge #124 Elevation


Bridge #124 Jefferson County

PROJECT DESCRIPTION

FPBH, Inc. provided the survey, right-of-way, preliminary, and final design engineering, specifications, bid documents, construction stakeout, construction inspection and material testing services for this locally funded bridge project for the Jefferson County Commissioners.

 

  WALGREENS SITE DESIGN 

North Vernon, Indiana

CLIENT
Anchor Properties
Bob Mooney
Cincinnati, OH

COMPLETION DATE
2006

Walgreens Storefront


Walgreens Retaining Wall


Underground Stormwater System

PROJECT DESCRIPTION

FPBH provided comprehensive site development services for a new Walgreens corner location that was proposed to take the place where an existing House, Motel, Gas Station and Liquor Store had once stood.
Up Front services included client representation for Rezoning, Variances, Lot Consolidation, and Public Hearings. Topographic Survey, Demolition Plans, ALTA Survey, complete site design with State Design Release, INDOT driveway permit, Rule 5 Erosion Control Permit, drainage design with underground detention, as-built ALTA survey, ADA compliance survey, and construction staking, rounded out the comprehensive project services.

 

  MORGAN'S BUILDING & SITE DESIGN 

City of North Vernon, Indiana

OWNER
Roger Morgan
1980 W Hurley Drive
North Vernon, IN 47265


PROJECT COMPLETION DATE
2006

Morgan’s Lawn & Garden Building/Parking


Morgan’s Lawn & Garden Building

PROJECT DESCRIPTION

FPBH provided retail building design utilizing efficiencies of pole barn construction practices.
All design of electrical, plumbing, HVAC, site, and architecture by FPBH to obtain an Indiana Construction Design Release.

 

  CITY SERVICE CENTER BUILDING & SITE DESIGN 

City of North Vernon, Indiana
3530 Euler Court

PUBLIC AGENCY - OWNER
City of North Vernon, IN
John G. Hall - Mayor
275 Main St.


PROJECT COMPLETION DATE
2006

North Vernon Service Center (Front)


North Vernon Service Center (Back)

PROJECT DESCRIPTION

This project included the design of a City Service Center building for North Vernon, IN.

FPBH, Inc. provided mechanical, electrical, and structural design for the City Service Center building in order to meet the client’s needs and obtain a State Design Release. FPBH also provided site design for the project, which included grading, utility, and drainage analysis.

 

  HILEX RAILROAD SPUR 

North Vernon, IN

PUBLIC AGENCY - OWNER
City of North Vernon
John G. Hall - Mayor
275 Main St.

Madison Railroad - User


PROJECT COMPLETION DATE
2006

Hilex Entrance Widening


Hilex Railroad Spur

PROJECT DESCRIPTION

This project arose out of an innovative funding mechanism that involved a Grant from the State of Indiana, a grant from The City of North Vernon Redevelopment Commission, Hilex Poly owner participation, and service by Madison Railroad.

Hilex Poly had recently expanded their recycling operations, and required additional car storage and material transfer.

FPBH took the lead to coordinate all of the parties interests and needs for construction to occur while the factory remained in 24 hour operation.

The project included a new parallel siding with a No. 7 turnout, a commercial roadway crossing, and utilized AREMA standards and CSX specifications.

 

  LANIER VISITOR'S CENTER 

Madison, IN

PUBLIC AGENCY - OWNER
State of Indiana
Matthew Pore – DNR Engineering

PROJECT COMPLETION DATE
2006

Lanier Visitors Center


Pavilion Looking Toward Lanier Mansion

PROJECT DESCRIPTION

This project was a designed to allow better access to Lanier and the Visitors Center for visitors and included, new Parking Area completed for Visitors Center of Historic Lanier Site. A Concrete and Brick Pavilion is also included with this project. The two areas are connected with a sidewalk which has a spiral stairway and a curved sidewalk. ADA accessibility for sidewalks is maintained between the difficult terrain.

 

  LOWE'S DISTRIBUTION CENTER 

Jennings County, IN

OWNER
Lowe’s
1301 W. JFK Drive
North Vernon, IN 47265

PROJECT COMPLETION DATES
1998
2005

Lowe’s Distribution Center


Aerial Image of Lowe’s Property


PROJECT DESCRIPTION


In 1994 in conjunction with Lowe’s as owner, and Duke of Indianapolis as the building contractor, FPBH provided complete site drawings for building layout, truck access, storm drainage and detention, and utility providers, for this 110-truck Midwest distribution center, located on 120 acres in North Vernon, Indiana.

The Lowe’s site was expanded in 1998 and again in 2005. FPBH was instrumental in working with the owner, local public agencies, and utility providers. Construction staking was also provided for the contractors.

 